Installation, Testing and Commissioning of Switchboards upto 33kV

Installation, Testing and commissioning is to be carried out by our expert team to ensure that they are safe and meet the design requirements. The witnessing of tests on and off site shall be defined by  mechanical and electrical requirements of the validation process.

The electrical switchgear may be tested with AC or DC voltage to check the condition of the insulation of switchgear and circuit breakers. Before conducting any other tests, an insulation resistance test (by Megger) should always be conducted first to determine if it is safe to conduct other HV tests.

Commissioning is the process of planning, documenting, scheduling, testing, adjusting, verifying, and training, to provide a facility that operates as a fully functional system per the Owner’s Project Requirements. We have expert team to do the same.